Technological Process Automation. Safety Improvement
Project: Installing security locks on palletzers.
Goal: Preventng unauthorized persons from entering the area of moving parts and mechanisms.
Task: Carrying out complex works on selecton and installaton of security systems with individual keys from doors of palletzers.
Descripton: Selecton of locks, delivery and installaton, integraton into the existng system of locks.
Scope of work:
-
Collecton of inital data for installaton/dismantling, partcipaton in the preparaton of technical design specifcaton, coordinaton;
- Material procurement;
- Dismantling and installaton of locks;
- Making changes to electrical circuit.
All works were done in accordance with the occupatonal safety requirements, fre safety, environmental and food safety standards, laws and regulatons (SNiP – Constructon rules and specifcatons, GOST – State standard, TU – engineering specifcatons, OST – industry-specifc standards, STP – company-specifc standards) and internal requirements of the customer.
Project: Installaton of water metering units by sectons
Project goal/Scope of work:
- System development, selecton of equipment, drawing up work algorithm
- Installaton of metering system
-
Electric installaton work: installaton of interfaces for meter reading, signal and power cable laying, power supply connecton to control switchboard.
All works were done in accordance with the occupatonal safety requirements, fre safety, environmental and food safety standards, laws and regulatons (SNiP – Constructon rules and specifcatons, GOST – State standard, TU – engineering specifcatons, OST – industry-specifc standards, STP – company-specifc standards) and internal requirements of the customer.